91黑料网

91黑料网 Index TV

31 July 2025

Related Information

Lifting the main pylon of the New Wear Crossing

Over a 16 hour period on 10th and 11th February 2017, the 105m tall pylon for the New Wear Crossing bridge was raised to vertical by a strandjacking operation conducted by Sarens.

Video uploaded on 15/02/2017 01:49pm.

Embed this video on your site:
Previous Page